After a tough couple of weeks for Dan Barnes and his team from DSB Maintenance and the SpaDental team in Plymouth, the new surgery is now finished and is looking absolutely fantastic.
We are all thrilled with the outcome, and smiling as much as we like our patients to!
Before – the old surgery
The surgery was a large room with rather old-fashioned cabinetry. It was time for things to change!
Dan took down the old cabinets and plastered the walls. He got a new floor down and strengthened it for our new dental chair unit. The finishing touch – he took down and replaced the ceiling tiles. A good chair and good lighting are essential in a dental surgery!
The electrician was in too.
The floorboards are up!
Our roof leaked at a crucial stage of the refurbishment. To fix the problem we put up emergency scaffolding. Thankfully, it didn’t hinder the work too much.
After – our new surgery is now finished
Take a look at the video. We’re sure you’ll think it looks fantastic too!
Read our surgery refurbishment story in full
- Time for a change at SpaDental Plymouth
- What a difference a day makes: Day two of the SpaDental Plymouth surgery refit
- Day three of the Surgery One refurbishment at Plymouth
- Plymouth’s new surgery takes shape on day four
- Progress in our surgery refit in Plymouth
- Early evening at Plymouth on day six: flooring done, cabinets waiting
- Plymouth surgery refurbishment nears completion
- This leak won’t dampen our spirits in Plymouth
- Rain will not stop play for Plymouth’s refurbishment
- Just the finishing touches to go and we will be ready in Plymouth
- Our surgery refurbishment is nearly ready for our patients in Plymouth
- A sneak peak of the new surgery in Plymouth
There is still work to do of course.
We are waiting for new dental stools, chairs & a table, some blinds, and some pictures. But we are thrilled that our new space is ready for use.